REAL SITE · REAL AR · YOUR MODEL

See AR BIM on a live construction site.

Watch our engineer walk onto an active job site, open DeltaARBIM and align an IFC model in under 60 seconds. See how DeltaARBIM detects a duct-to-beam clash before the concrete is poured.

±2 cm
ACCURACY
<60s
ALIGN TIME
IFC
FORMAT
60fps
AR RENDER

Active construction site: MEP clash detected

DUCT CLASH FLAGGED BEFORE INSTALLATION · REWORK PREVENTED

IN THIS VIDEO
  • IFC MODEL ALIGNED
  • MEP CLASH DETECTION
  • LiDAR ANCHORING
  • REAL SITE · NO STUDIO
  • UNDER 60 SECONDS

Ready when you are

Thirty minutes on your own model.

Free, remote, with the engineers who built DeltaARBIM.

Book my free demo
What happens in your demo

30 minutes. Your IFC model. Live.

No slides. Your project file, live, with the people who built it.

  1. 01 · MINUTES 0-5

    We load your IFC

    Send the file before the call. It is loaded and ready when we start.

  2. 02 · MINUTES 5-20

    Live AR walkthrough

    Your model overlaid on a site we are working on, with MEP layers, clash detection and field reporting.

  3. 03 · MINUTES 20-30

    Your questions

    Straight to the Ahmedabad engineers who built DeltaARBIM. No sales script.

Before you book

What the session needs, and what you leave with.

What to send
An IFC export of the floor you want to look at. Revit and Navisworks models export to IFC, and we load it before the call.
What you need
Thirty minutes and a screen. Nothing to install and nothing to set up on your side.
Who joins
The engineers who built DeltaARBIM, from the team in Ahmedabad. There is no sales layer to get through.
What you leave with
Straight answers on IFC compatibility, devices, offline use on your kind of site, and what pricing looks like for a project your shape.

FROM THE FIELD

Recorded on site, not in a studio.

After the walk, and the next morning.

Two short clips from site. What happens when tracking drifts, and how the model comes back on the next visit.

Recorded on site · iPad Pro · 1:08

Corner Realign

The model drifted while walking the floor. Fixed from where you stand.

  1. 1Model locked on the real walls
  2. 2Walk the site: tracking drifts over distance
  3. 3Realign at a corner: 11 cm corrected
Read what happens in the clip

The model is locked on the real walls. Now walk the site with it on. Over distance, AR tracking drifts: the model slowly shifts off the structure. Re-align from where you stand: a dotted line locks onto the corner and the ALIGN badge turns green. Done: 11 cm of drift corrected, without leaving the spot.

Recorded on site · iPad Pro · 1:50

QR recalibration

Calibrate once on day 1. Every visit after, one scan puts the model back.

  1. Day 1, once

    1Create a QR marker (print the PDF)
  2. 2Calibrate to site with 2 points
  3. 3Register the QR marker
  4. Every visit after

    4Scan the marker: the model loads in place
  5. 5Back to work, no 2-point calibration
Read what happens in the clip

Day 1, set up once. On the home screen, tap Generate QR PDF; every tap creates a new QR marker with its own ID. Open the IFC model and pick the level you are on. Calibrate to site with two points: place the pin on the first corner, then the second, check the model sits on the slab, then confirm. Register the QR marker and hold steady while it locks the calibration. Next day: pick the level, tap Align with QR Code, and scan the marker. The model loads back in place, with no 2-point calibration needed.

FAQ

Frequently askedquestions.

No IFC model ready yet? Get a free IFC check first.

Book your session

See DeltaARBIM onyour own model.

Bring your IFC model. We overlay it in live AR, so you see what DeltaARBIM does for your project and team.

Email
build@deltaarbim.tech
Demos, pricing, partnerships
Global availability
Remote demos worldwide
On-site visits available on request, on any plan. Client covers travel and accommodation.
Request your demo

Thirty minutes, remote, on your IFC model.

Who are you?
What is your role?
What do you need?
How should we reply?

Email or phone, whichever you prefer

IFC model ready? (optional)
+ Add your company
+ Add a note
Free. No commitment. We confirm a time within 24 hours.Privacy Policy