BIM validation for BIM and AEC teams
BIM validation for architects and BIM managers
You coordinate the model. DeltaARBIM lets you confirm the build actually matches it. Take your IFC model on site, overlay it on the real structure, and verify the field against your coordinated model to within 2 cm.
Your model is coordinated. The field may not be.
You clash-detect and coordinate in the office, then hand a clean model to the site. What you rarely get back is proof that what was built matches it.

No proof the field matches
The model leaves the office coordinated. Nothing comes back that confirms the building agrees with it.

A resolved clash, built wrong anyway
You moved the duct in the model. Whether it moved on site is a separate question, and usually an unanswered one.

RFIs arrive instead of answers
The first signal that reality drifted is a question from site, by which point somebody has already stopped work.
The model loses its authority
A record that does not match the building stops being consulted, and every hour that went into coordinating it is spent.
The frameworks your model is already governed by
None of this is new to you. It is set out here because on-site validation slots into it rather than replacing any of it.
Take the coordinated model to the wall.
Bring your IFC model, exported from Revit or Navisworks, onto the site. Anchor it to the structure with LiDAR and walk the build with each trade on its own layer, drawn over the real world to within 2 cm.
Confirm the field matches
Trade by trade, against the model you coordinated, to within 2 cm.
Capture deviations in place
Each one tagged to its exact position in the model, not described in a message.
Report back to the office
So the model and the build stay in step, and your team updates the record from something specific.
Trades on screen
Clash detected
The same trade switches you use to coordinate, running over the real structure. Isolate one discipline and check it where it was built.
DeltaARBIM is IFC native and verifies structure, walls, and MEP against the model to within 2 cm, offline, proven on real builds including two commercial complexes and a hospital.
- IFC native
- ±2 cm
- Works offline
- Layer by layer
Keep the model authoritative.
When the field is verified against the model, RFIs drop, disputes shrink, and the as-built you hand over is one you can stand behind. A clash caught in the model costs a fraction of the same clash found on site, and on-site validation is how you make sure the one you resolved actually stayed resolved.
BIM validation for AEC teams,asked and answered.
Put your own coordinated model on a real wall.
We will run a 30 minute walkthrough on an IFC model you export, so you can see how closely the field matches what you coordinated before you commit to anything.
Export your IFC. We will show you how closely the field matches it.
- Global availability
- Remote demos worldwide
- On-site visits available, client provides logistics. Ahmedabad · India · Global teams welcome