Construction BIM validation

On-site BIM validation for construction

DeltaARBIM overlays your IFC model on the real build, so your team catches clashes and verifies as-built work to within 2 cm, before it is buried. Built for GCs, MEP contractors, owners, and PMCs.

On a live site, the build drifts from the drawing.

Set-out creeps off the grid, an MEP run fouls a beam, a wall moves and never makes it back to the model. Each one is cheap to fix while the work is open, and expensive once the next trade builds on top.

  • Grid lines set out on a concrete slab before the next pour

    Set-out creeps off the grid

    A few centimetres at the column line becomes a real problem by the time the frame is up and the cladding is being set out from it.

  • A congested MEP ceiling void with ducts and containment crossing a structural beam

    An MEP run fouls a beam

    Coordinated in the office, built around an obstruction on site. The first anyone hears of it is the trade that cannot get through.

  • A blockwork wall built off the line shown on the drawing

    A wall moved and the model did not

    The change was right, the record was never updated, and the handover model now describes a building that does not exist.

  • Found after the floor closes

    Rework can run 5 to 9 percent of a project's cost (industry estimate), and most of it is found too late to be cheap.

The information standards a project is run to

Construction does not lack process. It lacks proof that the process survived contact with the site. These are the frameworks the model is already governed by.

Information management across the project lifecycle, and the delivery phase in particular. It governs how the model is produced, shared and approved. What it cannot do is confirm the thing on site matches what was approved.

Check the build against the model, on the floor.

Open your IFC model, anchor it to the floor with LiDAR, no markers or QR codes, then walk the space and see structure, walls, and MEP drawn over the real build to within 2 cm.

  • Structural verification

    Confirm rebar placement and slab levels against the structural IFC before the pour.

  • MEP clash detection

    Switch off every trade but the one you are checking, and find duct to beam clashes before fabrication.

  • QA and QC walkthroughs

    Replace the paper checklist with a live overlay, and tag issues where they are.

  • As-built records

    Capture what was actually built, so handover reflects the building rather than the drawing.

Trades on screen

Clash detected

Isolate one trade and a clash stops being an argument. The same controls run on site, offline, on the device your team already carries.

Live clash detection and as-built verification, on the device your team already carries.

DeltaARBIM has run on real builds, including two commercial complexes and a hospital, verifying structure, walls, and MEP against the model to within 2 cm.

  • ±2 cm
  • Works offline
  • IFC native
  • No markers

Independent verification for PMCs

As a PMC you answer to the owner, not the contractor. DeltaARBIM gives you independent, on-site BIM validation: tag every deviation to its exact spot in the model, hold each trade accountable, and hand the owner an audit trail instead of a description. Verify what was actually built, across all trades, on your own schedule and offline on site.

What catching it early is worth.

A deviation caught while the work is open is a correction. The same one found after the floor closes becomes rework, delay, and dispute. On-site BIM validation moves the moment of discovery earlier, so the fix stays a fix rather than a rebuild.

Corrected while the floor is open
₹1,80,000
Found after five trades build over it
₹24,00,000

13 times the cost, for the same deviation. An illustrative example. Figures vary by project. See the full worked example.

FAQ

Construction BIM validation,asked and answered.

See it on your own model.

We will run a 30 minute walkthrough on an IFC model you send us, so you can judge the 2 cm for yourself before committing to anything.

See it on your own build

Bring your model. We will show you what does not match.

Email
build@deltaarbim.tech
Demos, pricing, partnerships
Global availability
Remote demos worldwide
On-site visits available, client provides logistics. Ahmedabad · India · Global teams welcome
We reply within 24 hours. Free demo on your own model. No fixed tiers.
Book a free demo

Tell us where to send it and we will confirm a time.

No commitments. No credit card.Privacy Policy